Another Milestone in ALBA

ALBA PS5 1.800 MW CCPP Project, Block-3 Gas Turbine (GT81) on base load. All three Gas Turbines were loaded for the first time together on 15th of April 2019. Another milestone successfully completed by GAMA and GE Teams!