GAMA

Kremna
Enerji Üretim ve Ticaret A.Ş.


Karacaören-1 and Karacaören-2 hydroelectric power plants are located within borders of Burdur province Bucak district, and are dam type plants with have cascade structure. Karacaören-1 HPP was commissioned in 1990 with an installed capacity of 32 MW. The installed capacity of Karacaören-2 HPP, on the other hand, is 46.4 MW, and was commissioned in 1993.

Nergis Sokak No: 9/22, 06520, Söğütözü,
Yenimahalle, Ankara

Tel: +90 (312) 248 46 00
Fax: +90 (312) 248 46 01
MKK: e-şirket

Assets