TGT
Enerji Üretim ve Ticaret A.Ş.
Lamas III-IV HPP project was initiated in 1986 based on BOT model. After enactment of the Energy Market Law No. 4628, TGT Enerji Üretim ve Ticaret A.Ş. has renounced the rights earned for this project based on the BOT Law and filed an application to EPDK in October 2005 in order to obtain Energy Generation License and obtained said license in August 2006.
Nergis Sokak No: 9/20, 06520, Söğütözü,
Yenimahalle, Ankara
Tel: +90 (312) 248 46 00
Fax: +90 (312) 248 46 01
Assets

Lamas III-IV Run-of-River Hydroelectric Power Plant
TGT Enerji Üretim ve Ticaret A.Ş. Lamas III-IV Run-of-River Hydroelectric Power Plant Installed Capacity: 36,4 MW Annual Average Electricity Production: 75 GWh Main Equipment: 2 x 10,8 MW + 2 x 7,4 MW Pelton Turbine (VATech – Indar) Duration of License: 49 years from 2006 Commercial Operation Date: 2009 Location: Mersin, Turkey Shareholder Structure GAMA […]