Lamas III-IV Run-of-River Hydroelectric Power Plant Installed Capacity 36.4 MW Annual Average Electricity Production 70 GWh Main Equipment 2 x 10.8 MW + 2 x 7.4 MW Pelton Türbin (VATech – Indar) Commercial Operation Date 2009 Licence Duration 49 years from 2006 Location Mersin, Türkiye ← Tüm varlıklara geri dön