SARES WIND POWER PLANT

Sares Wind Power Plant

GARET Enerji Üretim ve Ticaret A.Ş.

Sares Wind Power Plant

  • Installed Capacity: 27.50 MW
  • Annual Average Electricity Production: 97.4 GWh
  • Main Equipment: 10 x 2.75 MW (9 x GE 2.5XL de-rated with wind boast + 1 x GE 2.75XL)
  • Duration of License: 49 years from 2008
  • Commercial Operation Date: 2010
  • Location: Çanakkale, Turkey

Shareholder Structure

  • GAMA Enerji: 98.79%
  • GAMA Holding: 0.30%
  • GAMA Endüstri: 0.30%
  • GAMA Güç Sistemleri: 0.30%
  • GAMA Ticaret: 0.30%