GARET Enerji Üretim ve Ticaret A.Ş.
Gök II Wind Power Plant
- Installed Capacity: 35 MW (License: 41.25 MW)
- Annual Average Electricity Production: 123 GWh
- Main Equipment: 13 x 2,75 MW (GE 2,75 XL)
- Duration of License: 49 years from 2012
- Commercial Operation Date: 2014
- Location : Manisa, Turkey
Shareholder Structure
- GAMA Enerji: 98.79%
- GAMA Holding: 0.30%
- GAMA Endüstri: 0.30%
- GAMA Güç Sistemleri: 0.30%
- GAMA Ticaret: 0.30%