Gök II Wind Power Plant

GARET Enerji Üretim ve Ticaret A.Ş.

Gök II Wind Power Plant

  • Installed Capacity: 35 MW (License: 41.25 MW)
  • Annual Average Electricity Production: 123 GWh
  • Main Equipment: 13 x 2,75 MW (GE 2,75 XL)
  • Duration of License: 49 years from 2012
  • Commercial Operation Date: 2014
  • Location : Manisa, Turkey

Shareholder Structure

  • GAMA Enerji: 98.79%
  • GAMA Holding: 0.30%
  • GAMA Endüstri: 0.30%
  • GAMA Güç Sistemleri: 0.30%
  • GAMA Ticaret: 0.30%

Kırkağaç Wind Power Plant

GARET Enerji Üretim ve Ticaret A.Ş.

Kırkağaç Wind Power Plant

  • Installed Capacity: 45 MW
  • Annual Average Electricity Production: 193,5 GWh
  • Main Equipment: 16 x (GE 2,85-103-50Hz)
  • Duration of License: 45 years from 2015
  • Commercial Operation Date: 2016
  • Location: Manisa

Shareholder Structure

  • GAMA Enerji: 98.79%
  • GAMA Holding: 0.30%
  • GAMA Endüstri: 0.30%
  • GAMA Güç Sistemleri: 0.30%
  • GAMA Ticaret: 0.30%