ÇAKIRLAR RUN-OF-RIVER HYDROELECTRIC POWER PLANT

Çakırlar Run-of-River Hydroelectric Power Plant

Anadolu Elektrik Üretim ve Ticaret A.Ş.

Çakırlar Run-of-River Hydroelectric Power Plant

  • Installed Capacity: 16,5 MW
  • Annual Average Electricity Production: 60 GWh
  • Main Equipment: 2 x 8,25 Pelton turbine (VATech – Indar)
  • Duration of License: 49 years from 2007
  • Commercial Operation Date: 2009
  • Location: Artvin, Turkey

Shareholder Structure

  • GAMA Enerji 99,96%
  • Other: 0,04%