TGT Enerji Üretim ve Ticaret A.Ş.
Lamas III-IV Run-of-River Hydroelectric Power Plant
- Installed Capacity: 36,4 MW
- Annual Average Electricity Production: 75 GWh
- Main Equipment: 2 x 10,8 MW + 2 x 7,4 MW Pelton Turbine (VATech – Indar)
- Duration of License: 49 years from 2006
- Commercial Operation Date: 2009
- Location: Mersin, Turkey
Shareholder Structure
- GAMA Enerji: 99,95%
- EÜAŞ: 0,03%
- Other: 0,02%