Kremna Enerji Üretim ve Ticaret A.Ş.
Karacaören-1 Dam Type Hydroelectric Power Plant:
- Installed Capacity: 32 MW
- Annual Average Electricity Production: 110 GWh
- Main Equipment: 2 x 16 MW Francis Turbine (JM VOITH – ELIN)
- Duration of License: 49 years from 2016
- Commercial Operation Date: 1990
- Location: Burdur, Turkey
Karacaören-2 Dam Type Hydroelectric Power Plant:
- Installed Capacity: 46.4 MW
- Annual Average Electricity Production: 160 GWh
- Main Equipment: 2 x 23.2 MW Francis Turbine (Harbin)
- Duration of License: 49 years from 2016
- Commercial Operation Date: 1993
- Location: Burdur, Turkey
Shareholder Structure:
- GAMA Enerji: 100%