Karacaören 1 & 2 Dam Type Hydroelectric Power Plant

Kremna Enerji Üretim ve Ticaret A.Ş.

Karacaören-1 Dam Type Hydroelectric Power Plant:

  • Installed Capacity: 32 MW
  • Annual Average Electricity Production: 110 GWh
  • Main Equipment: 2 x 16 MW Francis Turbine (JM VOITH – ELIN)
  • Duration of License: 49 years from 2016
  • Commercial Operation Date: 1990
  • Location: Burdur, Turkey

Karacaören-2 Dam Type Hydroelectric Power Plant:

  • Installed Capacity: 46.4 MW
  • Annual Average Electricity Production: 160 GWh
  • Main Equipment: 2 x 23.2 MW Francis Turbine (Harbin)
  • Duration of License: 49 years from 2016
  • Commercial Operation Date: 1993
  • Location: Burdur, Turkey

Shareholder Structure:

  • GAMA Enerji: 100%

Lamas III-IV Run-of-River Hydroelectric Power Plant

TGT Enerji Üretim ve Ticaret A.Ş.

Lamas III-IV Run-of-River Hydroelectric Power Plant

  • Installed Capacity: 36,4 MW
  • Annual Average Electricity Production: 75 GWh
  • Main Equipment: 2 x 10,8 MW + 2 x 7,4 MW Pelton Turbine (VATech – Indar)
  • Duration of License: 49 years from 2006
  • Commercial Operation Date: 2009
  • Location: Mersin, Turkey

Shareholder Structure

  • GAMA Enerji: 99,95%
  • EÜAŞ: 0,03%
  • Other: 0,02%

Çakırlar Run-of-River Hydroelectric Power Plant

Anadolu Elektrik Üretim ve Ticaret A.Ş.

Çakırlar Run-of-River Hydroelectric Power Plant

  • Installed Capacity: 16,5 MW
  • Annual Average Electricity Production: 60 GWh
  • Main Equipment: 2 x 8,25 Pelton turbine (VATech – Indar)
  • Duration of License: 49 years from 2007
  • Commercial Operation Date: 2009
  • Location: Artvin, Turkey

Shareholder Structure

  • GAMA Enerji 99,96%
  • Other: 0,04%