
GARET
Enerji Üretim ve Ticaret A.Ş.
GARET, in which GAMA Enerji holds a 100% share, was established in March 2006 to develop wind and hydroelectric power projects. The company operates four wind power plants with a total installed capacity of 117.5 MW: Sares WPP (27.5 MW) in Çanakkale, which commenced commercial operations in March 2011; Karadağ WPP (10 MW) in İzmir, commissioned in July 2012; Gökres-2 II WPP (35 MW) in Manisa, operational since August 2014; and Kırkağaç WPP (45 MW) in Manisa, which began production with two turbines in October 2016 and became fully operational in February 2017.
In addition to these wind power plants, the company also owns two run-of-river hydroelectric power plants with a total installed capacity of 52.9 MW: Lamas III-IV HEPP (36.4 MW) in Mersin, which entered commercial operation in 2009, and Çakırlar HEPP (16.5 MW) in Artvin, commissioned in the same year. With these assets, GARET’s total installed capacity reaches 170.4 MW.
Nergis Sokak No: 9/21, 06520, Söğütözü,
Yenimahalle, Ankara
Tel: +90 (312) 248 46 00
Fax: +90 (312) 248 46 01
MKK: e-şirket